There were three inclines of which only two were completed. Capel Ifan (56' rise) and Pont Henry (57' rise) were constructed in 1838 and closed by 1867. The third incline at Hirwaun Isaf (84') rise was never completed. All were obliterated during further mining and construction of the railway.
140 yds long
300 yds long